Jobs

Which skip for a bathroom refit

First published 31 August 2026. Last checked 31 August 2026.

One bathroom of suite, tiles and ordinary fit-out usually fits a 4-yard skip. Two bathrooms, or a lot of screed and masonry, move you to a 6-yard. Tiles and screed count as heavy waste – do not book a large open-backed skip for them.

Yellow open-top skip overflowing with bags on a pavement
Photo: Sebastián Agarrayúa via Unsplash (Unsplash)

Starting size

What you are stripping Usual starting size When to change it
One suite, splash tiles, ordinary boarding 4-yard The usual midi for a single bathroom. Confirm gate width.
Two bathrooms, or one bathroom plus a lot of screed 6-yard Still treat dense tile and screed as heavy waste. Fill below the rim.
Mostly tiles, screed, brick or concrete 4- or 6-yard only Do not size up to an 8-yard of rubble. See soil, rubble and concrete.
A tiny cloakroom tidy 2-yard or 4-yard Ask the firm what they will deliver into a tight side return.

More context on the size guide and the 4-yard page.

Heavy waste in a bathroom job

Ceramic tiles, screed, brick and concrete are dense. The limit that matters is the lorry’s lift, not empty air at the top of a larger skip. Hire firms routinely refuse an 8-, 10- or 12-yard of rubble even though the skip looks “bigger”.

If most of the load is tiles, screed or masonry, treat 6-yard as the ceiling unless the operator explicitly offers a larger heavy-waste skip. Level, do not peak.

Keep these separate

Full banned and restricted list: what you cannot put in a skip.

Suites and ceramics

Baths, basins, WCs and ceramic tiles are normally accepted as mixed building waste when they are clean of hazardous residues. Break large items only if the firm allows it and you can load safely without heaping above the rim. Some firms prefer you leave a cast-iron bath for a separate collection – ask when you book.

Placement and the carrier

Skip Clerk has no hire partners yet and no prices on this page. When we add a booking link it will be marked as an affiliate link. Until then, use a licensed local operator and confirm the load type with them.

Sources